As usual, morning roll call and briefing from En. Norakmal.. After, went to Setia Tropika to do paid work ( kerja-kerja yang dibayar ) to resite the five foot way and meter box because the owner extend the house, so have to resite the cables and meter box.

The first step is, we have to switch off the supply by pull out the fuse at black box. Second step is we have to take out the existing connection and also the meter box. The team will discussed about the new connection and where to place the meter.










































Third step is we placed the cable holder to the wall, placed the new cable on the cable holder ( one black box give supply to 3 unit houses, so the connection connect to 3 house)




























Forth step is we have to cut the cable based on measuring. The cable is cut into 4 pieces for three phase system. The existence connection will be marked with tape.

Next, the cable will be placed on the cable holder and clip was used to hold the cable at its place. After that, En. Shahrin join the existing cable connection with new connection using junction box. In this case, two junction box have been used since the house used three phase system.






























The junction box was used to do connection between cable and also to avoid the phase cable from touching each other ( the connection part) because if the connection part of different phase touching each other the system may collapse.