1/6/2010
1. morning briefing by En. Hafiz
2. went to PMU, PPU to take load reading
i. PMU Tanjung Kupang
ii. PPU Gelang Patah
iii.PPU Taman Tun Aminah
iv.PMU Taman Perling
The purpose of taking load reading is to record the reading load for monitoring the load that have been used. The load reading was taken around 10am or 8pm because that time is peak load.
2/6/2010
1. Morning briefing.
2.Preventive shutdown at P/E LPN, Kempas ( outdoor ) . The shutdown was held for maintenance of switch gear and transformer.